Reduced Civil Engineering Costs
The integrated steel base helps your project avoid expensive deep foundation excavation and concrete pouring, helping your project reduce deep foundation preparation and related site work.
A foundation-free concrete batching plant uses a modular steel base structure to reduce traditional deep foundation work and shorten site preparation time. It is suitable for projects that need faster installation, controlled civil work, and stable concrete production, while still requiring proper ground bearing capacity, level surface preparation, truck access, power supply, and layout review.
These customer cases cover highway construction, urban expansion, mining infrastructure, and airport pavement projects where site preparation time, relocation flexibility, and concrete supply continuity are important project requirements.
Compare MHZS foundation-free concrete batching plant models from 25 m3/h to 120 m3/h according to your specific output demand, mixer configuration, site restrictions, and project duration. This helps your team select the exact capacity needed without over-investing in equipment or site preparation.
| Model | Capacity | Mixer | Batching Machine | Aggregate Bins | Cement Silo | Screw Conveyor | Control System | Recommended For | Selection Note |
|---|---|---|---|---|---|---|---|---|---|
| MHZS25 | 25 m3/h | JS500 | PLD800 | 2-3 bins optional | 50T or 100T optional | LSY219 | Semi-automatic or Automatic | Small rural projects, fast-setup local supply, contractor self-use | Entry-level foundation-free model with a minimal footprint, helping you start concrete production with the reduced initial site preparation investment and simplest ground preparation. |
| MHZS35 | 35 m3/h | JS750 | PLD1200 | 2-3 bins optional | 50T or 100T optional | LSY219 | Automatic control system | Small precast yards, housing construction, temporary road works | Better capacity than MHZS25, suitable for standard small projects requiring quick setup, easy relocation, and reliable daily concrete output. |
| MHZS60 | 60 m3/h | JS1000 | PLD1600 | 3-4 bins optional | 100T optional | LSY219 | Automatic control system | Medium commercial concrete, bridge projects, regional infrastructure | Balanced capacity for continuous medium-scale pouring. It significantly reduces your civil work costs while maintaining the stability of a stationary plant. |
| MHZS90 | 90 m3/h | JS1500 | PLD2400 | 3-4 bins optional | 100T or 200T optional | LSY273 | Automatic control system | Infrastructure projects, highway construction, high-demand temporary sites | High efficiency for demanding continuous supply. It helps your heavy-duty projects stay on schedule by bypassing weeks of deep foundation curing time. |
| MHZS120 | 120 m3/h | JS2000 | PLD3200 | 4 bins | 100T or 200T optional | LSY273 | Automatic control system | Large commercial ready-mix, major civil works, urban expansion projects | Strong continuous output for high-volume commercial needs. This gives your project higher production capacity while keeping the heavy equipment completely relocatable for future sites. |
A useful video should show the steel frame base, aggregate batching system, mixer platform, cement feeding route, control cabinet, truck discharge, and site setup process so buyers can understand how the plant reduces traditional foundation work.
The value of a foundation-free batching plant is not only faster installation. You also need to confirm whether the modular base, ground condition, plant footprint, silo arrangement, truck route, and commissioning plan can work together at the real project site.
The integrated steel base helps your project avoid expensive deep foundation excavation and concrete pouring, helping your project reduce deep foundation preparation and related site work.
By eliminating the 15-20 day foundation curing period, your plant can be installed, wired, and commissioned in just 3-5 days after ground leveling.
The modular structure allows your team to disassemble the plant, load it onto standard trailers, and move it to the next jobsite, preserving your equipment investment.
Despite the lack of a deep foundation, the scientifically distributed weight and rigid steel frame support the JS twin-shaft mixer for consistent, high-quality concrete mixing up to 120 m3/h.
Before delivery, QIC Machinery reviews the steel frame base, mixer platform, aggregate batching system, bolt connection points, control cabinet, spare parts, and packing sequence. These checks help the buyer prepare the site and reduce installation mismatch after the equipment arrives.

The integrated steel frame base and modular structures are pre-assembled and checked in the QIC Machinery factory to review connection accuracy, structural alignment, and shipment readiness before delivery.

Main components, including the JS mixer and batching system, are securely loaded into containers, helping your team minimize unloading time and start installation immediately upon arrival.
You should prepare a level and load-bearing site, confirm drainage, truck turning space, aggregate loading route, cement silo position, screw conveyor angle, power supply, lifting access, and commissioning sequence before installing a foundation-free batching plant.

Silos still require secure support. We guide your team on safely positioning the cement silos and screw conveyors to ensure stable powder storage and accurate feeding.
QIC Machinery helps you determine the required ground bearing capacity, ensuring your leveled site or steel plates can safely support the integrated steel frame base during heavy dynamic operation.
We provide layout drawings to help you arrange aggregate stockpiles, wheel loader feeding paths, and clear access routes for multiple concrete mixer trucks simultaneously.
Our engineers assist you in confirming that local voltage, total power capacity, and water supply match the plant's high-capacity operational requirements before the equipment arrives.
Once the modular steel base and main systems are placed, QIC Machinery can arrange engineer support to guide the final wiring, system commissioning, and operator training to ensure your team starts production safely.
A foundation-free plant combines a modular steel base, aggregate batching machine, twin-shaft mixer, cement silo and screw conveyor connection, weighing system, water and additive dosing, PLC control cabinet, and truck discharge route into a civil-work-light batching system.

The heavy-duty steel chassis connects the main mixing tower and weighing components, distributing dynamic loads evenly to the prepared ground.
QIC Machinery helps you review whether a foundation-free structure fits their ground condition, output target, installation schedule, silo plan, truck route, voltage, and overseas delivery needs. The goal is to reduce civil-work uncertainty before shipment.
We help you evaluate your daily concrete demand and project timeline to ensure you select the correct MHZS model (from 25 to 120 m3/h) without over-investing.
QIC Machinery provides site-specific layout drawings to help you arrange your limited space, truck routes, and ground hardening preparation before the plant arrives.
Communicating directly with the manufacturer helps you clarify voltage requirements, control system options, and specific configuration details faster.
We can arrange engineer guidance for ground preparation review, steel base leveling, wiring, and operator training to ensure a smooth, rapid project launch.
These answers explain where foundation-free batching plants fit, what site preparation is still required, how they differ from stationary plants, and what information QIC Machinery needs before recommending a configuration.
It eliminates the need for deep, excavated concrete foundation pits for the main mixing tower. However, your site still requires leveled, compacted ground, and often a simple hardened concrete pad or steel plates to ensure long-term stability for high-capacity production.
The plant utilizes an integrated, heavy-duty steel frame base. This structure connects the main components and distributes the dynamic vibrations and weight evenly across the ground, ensuring safe operation even at 120 m3/h capacity.
Because you skip the 15-20 days of deep foundation pouring and curing, installation of a foundation-free plant usually takes only 3-5 days once the ground is prepared and equipment is unloaded.
Yes. The modular design and steel base make it much easier to disassemble and transport to a new jobsite compared to a traditional stationary plant, saving you significant money on future civil works.
Mobile batching plants have a wheeled chassis and can be towed directly by a truck for extremely frequent moves. Foundation-free plants do not have wheels but use a robust steel frame base, offering much higher capacities (up to 120 m3/h) while still being easier to relocate than stationary plants.
Your site still needs leveled, compacted, and load-bearing ground before installation. A foundation-free batching plant reduces deep foundation excavation, but it does not mean the equipment can be placed on soft or unstable soil. Share your site condition so QIC Machinery can provide layout guidance for hardened ground, steel plates, drainage direction, and truck access.
Yes, cement silos usually require proper support or foundation treatment because they carry heavy vertical loads when filled with cement or fly ash. The main batching plant can use an integrated steel frame base, but silo placement should still be reviewed according to silo capacity, local wind load, ground condition, and site safety requirements.
Yes. QIC Machinery can provide layout references before production according to your target capacity, site size, silo quantity, aggregate feeding route, truck access, control room position, and installation schedule. This helps your team confirm the plant arrangement before shipment and reduce layout changes during installation.
QIC Machinery prepares the shipment plan according to equipment size, container loading sequence, destination port, and installation order. The steel frame base, JS mixer, PLD batching machine, screw conveyors, control cabinet, and accessories are organized before loading to reduce transport risk and support easier site assembly. Bolted cement silos can be packed in sections to improve container space utilization.
Your first-year spare parts plan should cover mixer liners, mixing arms, blades, shaft-end seals, weighing sensors, pneumatic components, valves, conveyor parts, electrical components, and lubrication parts. QIC Machinery can help your project prepare a spare parts package according to your MHZS model, working hours, raw material condition, and maintenance schedule.
Tell us your project type, expected output, and site condition. Our team will help you compare batching plant options and recommend the right solution.