MHZS Foundation-free Concrete Batching Plant

MHZS Foundation-free Concrete Batching Plant

A foundation-free concrete batching plant uses a modular steel base structure to reduce traditional deep foundation work and shorten site preparation time. It is suitable for projects that need faster installation, controlled civil work, and stable concrete production, while still requiring proper ground bearing capacity, level surface preparation, truck access, power supply, and layout review.

Customer Cases

MHZS Foundation-free Concrete Batching Plant Customer Solutions

These customer cases cover highway construction, urban expansion, mining infrastructure, and airport pavement projects where site preparation time, relocation flexibility, and concrete supply continuity are important project requirements.

Capacity Matrix

Foundation-free Concrete Batching Plant Capacity Matrix (25-120 m3/h)

Compare MHZS foundation-free concrete batching plant models from 25 m3/h to 120 m3/h according to your specific output demand, mixer configuration, site restrictions, and project duration. This helps your team select the exact capacity needed without over-investing in equipment or site preparation.

ModelCapacityMixerBatching MachineAggregate BinsCement SiloScrew ConveyorControl SystemRecommended ForSelection Note
MHZS2525 m3/hJS500PLD8002-3 bins optional50T or 100T optionalLSY219Semi-automatic or AutomaticSmall rural projects, fast-setup local supply, contractor self-useEntry-level foundation-free model with a minimal footprint, helping you start concrete production with the reduced initial site preparation investment and simplest ground preparation.
MHZS3535 m3/hJS750PLD12002-3 bins optional50T or 100T optionalLSY219Automatic control systemSmall precast yards, housing construction, temporary road worksBetter capacity than MHZS25, suitable for standard small projects requiring quick setup, easy relocation, and reliable daily concrete output.
MHZS6060 m3/hJS1000PLD16003-4 bins optional100T optionalLSY219Automatic control systemMedium commercial concrete, bridge projects, regional infrastructureBalanced capacity for continuous medium-scale pouring. It significantly reduces your civil work costs while maintaining the stability of a stationary plant.
MHZS9090 m3/hJS1500PLD24003-4 bins optional100T or 200T optionalLSY273Automatic control systemInfrastructure projects, highway construction, high-demand temporary sitesHigh efficiency for demanding continuous supply. It helps your heavy-duty projects stay on schedule by bypassing weeks of deep foundation curing time.
MHZS120120 m3/hJS2000PLD32004 bins100T or 200T optionalLSY273Automatic control systemLarge commercial ready-mix, major civil works, urban expansion projectsStrong continuous output for high-volume commercial needs. This gives your project higher production capacity while keeping the heavy equipment completely relocatable for future sites.
Product Video

Foundation-free Batching Plant Structure and Setup Video

A useful video should show the steel frame base, aggregate batching system, mixer platform, cement feeding route, control cabinet, truck discharge, and site setup process so buyers can understand how the plant reduces traditional foundation work.

Model Advantages

Advantages of Foundation-free Plant Layout

The value of a foundation-free batching plant is not only faster installation. You also need to confirm whether the modular base, ground condition, plant footprint, silo arrangement, truck route, and commissioning plan can work together at the real project site.

Reduced Civil Engineering Costs

The integrated steel base helps your project avoid expensive deep foundation excavation and concrete pouring, helping your project reduce deep foundation preparation and related site work.

Faster Project Startup

By eliminating the 15-20 day foundation curing period, your plant can be installed, wired, and commissioned in just 3-5 days after ground leveling.

Easier Site Relocation

The modular structure allows your team to disassemble the plant, load it onto standard trailers, and move it to the next jobsite, preserving your equipment investment.

Stable High-volume Production

Despite the lack of a deep foundation, the scientifically distributed weight and rigid steel frame support the JS twin-shaft mixer for consistent, high-quality concrete mixing up to 120 m3/h.

Factory & Delivery Records

Factory Review for Foundation-free Plant Delivery

Before delivery, QIC Machinery reviews the steel frame base, mixer platform, aggregate batching system, bolt connection points, control cabinet, spare parts, and packing sequence. These checks help the buyer prepare the site and reduce installation mismatch after the equipment arrives.

Foundation-free Concrete Batching Plant components prepared for shipment

MHZS120 Foundation-free Steel Base Assembly in Factory

The integrated steel frame base and modular structures are pre-assembled and checked in the QIC Machinery factory to review connection accuracy, structural alignment, and shipment readiness before delivery.

Foundation-free Concrete Batching Plant secure packing before delivery

MHZS Series Plant Packed for Overseas Delivery

Main components, including the JS mixer and batching system, are securely loaded into containers, helping your team minimize unloading time and start installation immediately upon arrival.

Layout & Installation

Site Layout Requirements for Foundation-free Installation

You should prepare a level and load-bearing site, confirm drainage, truck turning space, aggregate loading route, cement silo position, screw conveyor angle, power supply, lifting access, and commissioning sequence before installing a foundation-free batching plant.

Foundation-free Concrete Batching Plant layout and installation support

Cement Silo Position Matching

Silos still require secure support. We guide your team on safely positioning the cement silos and screw conveyors to ensure stable powder storage and accurate feeding.

Ground Preparation and Hardening

QIC Machinery helps you determine the required ground bearing capacity, ensuring your leveled site or steel plates can safely support the integrated steel frame base during heavy dynamic operation.

Site Size and Traffic Flow Review

We provide layout drawings to help you arrange aggregate stockpiles, wheel loader feeding paths, and clear access routes for multiple concrete mixer trucks simultaneously.

Power and Water Access

Our engineers assist you in confirming that local voltage, total power capacity, and water supply match the plant's high-capacity operational requirements before the equipment arrives.

Commissioning and Operator Guidance

Once the modular steel base and main systems are placed, QIC Machinery can arrange engineer support to guide the final wiring, system commissioning, and operator training to ensure your team starts production safely.

Main Systems

Main Systems of a Foundation-free Concrete Batching Plant

A foundation-free plant combines a modular steel base, aggregate batching machine, twin-shaft mixer, cement silo and screw conveyor connection, weighing system, water and additive dosing, PLC control cabinet, and truck discharge route into a civil-work-light batching system.

Foundation-free Concrete Batching Plant mixer platform and main systems

The heavy-duty steel chassis connects the main mixing tower and weighing components, distributing dynamic loads evenly to the prepared ground.

Why Buy from QIC Machinery

Why Buy Foundation-free Batching Plants from QIC Machinery

QIC Machinery helps you review whether a foundation-free structure fits their ground condition, output target, installation schedule, silo plan, truck route, voltage, and overseas delivery needs. The goal is to reduce civil-work uncertainty before shipment.

01 Configuration

Accurate Capacity Matching

We help you evaluate your daily concrete demand and project timeline to ensure you select the correct MHZS model (from 25 to 120 m3/h) without over-investing.

02 Layout

Pre-delivery Layout Review

QIC Machinery provides site-specific layout drawings to help you arrange your limited space, truck routes, and ground hardening preparation before the plant arrives.

03 Factory Records

Factory Direct Technical Communication

Communicating directly with the manufacturer helps you clarify voltage requirements, control system options, and specific configuration details faster.

04 Installation

Installation and Startup Support

We can arrange engineer guidance for ground preparation review, steel base leveling, wiring, and operator training to ensure a smooth, rapid project launch.

Product FAQ

Foundation-free Concrete Batching Plant FAQs

These answers explain where foundation-free batching plants fit, what site preparation is still required, how they differ from stationary plants, and what information QIC Machinery needs before recommending a configuration.

Does a foundation-free batching plant really need no concrete foundation? Click to expandClick to close

It eliminates the need for deep, excavated concrete foundation pits for the main mixing tower. However, your site still requires leveled, compacted ground, and often a simple hardened concrete pad or steel plates to ensure long-term stability for high-capacity production.

How can the plant stay stable during heavy production? Click to expandClick to close

The plant utilizes an integrated, heavy-duty steel frame base. This structure connects the main components and distributes the dynamic vibrations and weight evenly across the ground, ensuring safe operation even at 120 m3/h capacity.

How long does installation usually take? Click to expandClick to close

Because you skip the 15-20 days of deep foundation pouring and curing, installation of a foundation-free plant usually takes only 3-5 days once the ground is prepared and equipment is unloaded.

Can the plant be relocated later? Click to expandClick to close

Yes. The modular design and steel base make it much easier to disassemble and transport to a new jobsite compared to a traditional stationary plant, saving you significant money on future civil works.

What is the difference between foundation-free and mobile batching plants? Click to expandClick to close

Mobile batching plants have a wheeled chassis and can be towed directly by a truck for extremely frequent moves. Foundation-free plants do not have wheels but use a robust steel frame base, offering much higher capacities (up to 120 m3/h) while still being easier to relocate than stationary plants.

What ground condition is required for a foundation-free concrete batching plant? Click to expandClick to close

Your site still needs leveled, compacted, and load-bearing ground before installation. A foundation-free batching plant reduces deep foundation excavation, but it does not mean the equipment can be placed on soft or unstable soil. Share your site condition so QIC Machinery can provide layout guidance for hardened ground, steel plates, drainage direction, and truck access.

Does the cement silo still need a separate foundation? Click to expandClick to close

Yes, cement silos usually require proper support or foundation treatment because they carry heavy vertical loads when filled with cement or fly ash. The main batching plant can use an integrated steel frame base, but silo placement should still be reviewed according to silo capacity, local wind load, ground condition, and site safety requirements.

Can QIC Machinery provide layout drawings before production? Click to expandClick to close

Yes. QIC Machinery can provide layout references before production according to your target capacity, site size, silo quantity, aggregate feeding route, truck access, control room position, and installation schedule. This helps your team confirm the plant arrangement before shipment and reduce layout changes during installation.

How are the steel frame base, mixer, batching machine, and silos packed for shipment? Click to expandClick to close

QIC Machinery prepares the shipment plan according to equipment size, container loading sequence, destination port, and installation order. The steel frame base, JS mixer, PLD batching machine, screw conveyors, control cabinet, and accessories are organized before loading to reduce transport risk and support easier site assembly. Bolted cement silos can be packed in sections to improve container space utilization.

What spare parts should be prepared for the first year of operation? Click to expandClick to close

Your first-year spare parts plan should cover mixer liners, mixing arms, blades, shaft-end seals, weighing sensors, pneumatic components, valves, conveyor parts, electrical components, and lubrication parts. QIC Machinery can help your project prepare a spare parts package according to your MHZS model, working hours, raw material condition, and maintenance schedule.

Factory Quote

Need a Factory Quote or Layout Recommendation?

Tell us your project type, expected output, and site condition. Our team will help you compare batching plant options and recommend the right solution.

Please include these key project details:
  1. Target capacity or expected daily output.
  2. Project type, jobsite condition, or concrete business plan.
  3. Country, delivery deadline, and installation expectations.
  4. Whether you need a turnkey line or only the core batching plant.
Get Your Quote

Send Your Inquiry Requirements

We respect your privacy and will not share your personal information with other entities.

WhatsApp
WhatsApp Get Quote